Your dream floor is only one day away! Signup to receive a hassle-free consultation with samples, color options and choose to have your perfect custom floor toĀ be installed the Choice Epoxy Coatings Way!
Choice Epoxy coatings is family owned and operated, proudly serving the Treasure Coast and surrounding areas. We are your premium epoxy flooring installers, certified and trusted. From diamond grinding surface prep, to using only the highest quality industrial grade products, we believe in taking the time to ensure a proper installation and guarantee long lasting, durable, and beautiful floors.
The most crucial phase in any flooring job is the preparation phase. Modern diamond grinders and a self-contained vacuum system are used by The Epoxy Pros to forge an unbreakable mechanical link with the substrate. After unloading the machinery, our staff will assess the density of the concrete to determine which diamond blades will work best for grinding your floor.
Next, we will grind the entire floor’s surface. This is a crucial step since it opens the concrete material and profiles the substrate. The edges will then be smoothed down by our team using a manual grinder.
It is crucial that the floor be completely ready for the coating on every square inch. The Epoxy Pros combine a polyaspartic topcoat with an epoxy basecoat. The coating can be applied to vertical surfaces including foundation walls, cinder blocks, wooden baseboards, and wooden steps.
This stage includes washing the surface of all particles and grinding the surface.
Hairline fractures in concrete pads are a regular occurrence. While these cracks are normal, they must be opened with a diamond cutting wheel so that mortar or polyurea filler can be applied. The filler heals in around twenty-five minutes after application, which is quick.
The floor needs to be very smooth and free of any obvious fractures. Floors frequently have salt pits or other small areas of wear and tear, but in order to have a perfect, smooth surface, these areas also need to be filled and leveled.
We will vacuum the floor once the grinding procedure is complete to ensure that all dust and debris have been eliminated.
The Epoxy Pros offers a 1- or 2-day system that combines an epoxy basecoat and a polyaspartic top coating. The size of your floor will determine which system we select.
With the one-day system, you can resume normal foot traffic and usage the next day, up to a 250-pound weight restriction. On the second day after the application, you can resume normal foot traffic and usage with the 2-day system. 48 hours after completion, the floor is entirely healed with any system.
We will mix the 2 components by adding pigment to the base coat chosen by our customerās choice of pre-blended vinyl flakes. To achieve 100% coverage, roll the base coat onto all vertical surfaces first, then liberally apply the flakes.
Our team will vacuum the extra material from the floor prior to applying the base coat. Next, we’ll cover the whole floor with the base coat.Ā
After that, our team will back-roll it after using a squeegee to apply a clear finish. This will ensure that the topcoat is thick and even throughout, leaving a steady, long-lasting finish.
Topcoat Specifications:
Ā
Since weather and other environmental elements might cause varying curing waiting durations, The Epoxy Pros can provide you with advice on curing times.
Lastly, we will tidy up your property and reload our supplies and equipment onto our mobile truck.
We believe that our job isnāt just to provide epoxy flooring but to enhance your property. Our expert designers and installation specialists work hand in hand with you to give you the best flooring options that perfectly blend with your homeās interior and exterior.